1. Connect and install the inverter in strict accordance with the requirements of the inverter operation and maintenance manual. In the installation, should carefully check: wire diameter is in line with the requirements; Whether the parts and terminals are loose during transportation: whether the parts that should be insulated are well insulated; The grounding of the system complies with regulations.
2. The inverter shall be operated in strict accordance with the provisions of the operation and maintenance manual. In particular: before starting, we should pay attention to whether the input voltage is normal: in operation, we should pay attention to whether the order of switching machine is correct, the table head and indicator light indication is normal.
3. the inverter is generally open, over current, over voltage, overheating and other items of automatic protection, so in the occurrence of these phenomena, without manual shutdown: automatic protection point, generally in the factory has been set, no need to adjust.
4. There is high pressure in the inverter cabinet, and the operator is generally not allowed to open the cabinet door, which should be locked in peacetime
5. When the room temperature exceeds 30C, heat dissipation and cooling measures should be taken to prevent the failure of the equipment and prolong the use of the equipment Life span.
Hot Tags: lithium ion batteries lifepo4 cells 18650 lifepo4